Key system components suited perfectly for the transporation industry include:
GPS - 3 Axis Location Assignment - This allows for both point and elevation location for a job or asset. The system currently will display this
location on a map.
Mile Post and Highway Location - On the job or work order, the system will allow the user to select which highway the maintenance activity took
place and the mile marker on the highway. For split multi-lane highways, the user can select increasing or decreasing to indicate which side of the highway.
Work Operation Codes - These codes are user defined and allow the user to classify each code used by the department and what unit of measure is
associated with the code. The work order allows one Work Operation Code and both and estimated and actual units of production accomplished.
Project Inspection Daily Project Diary - This module is used for both the construction engineering and inspection staff to record their daily project
inspections. Along with the details for the contractor(s) and equipment on site, this module records photos from the site and enforces BMP practices as
applicable. The project diary also integrates into the time card entry process.
Daily Time Card and Maintenance Work - Integrated into specific work order(s), of which several can be accomplished in a single day is the time
card entry or DMR (Daily Maintenance Reporting) as referenced by some of our DOT clients. This function allows the maintenance supervisor to record all
activities for their crew on a daily basis, with details as to where they worked, what was accomplished, and what resources were utilized. Financial and
payroll export options.
Highway Section Cost Codes and function codes for all DOT maintenance activities.
For Detailed Information On M-PET.NET And How It Relates Specifically To The Transportation Field, Click Here.